WebETWB TCW No. 34/2002 Page 3 of 4 Classification of Sediment 11. DEP, as the Authority under the Dumping at Sea Ordinance Cap. 466 (DASO), will classify sediments based on … WebMay 25, 2015 · The design required the removal of 220 000 m 3 of marine mud by dredging. This would have resulted in a 20 m deep trench with a 1 in 2 landward slope excavated down to a level of −16·5 m PD (PD: Hong Kong principal datum), with the existing seawall and adjacent village houses restrained by temporary steel sheet piling.

8. WASTE MANAGEMENT 8.1 Introduction Construction and

WebTherefore, the proposed works will not have any archaeological impact on the said SAI during the construction phrase. Land Contamination Marine sediments will be generated from the foundation works at the coastal sections near Sham Shing Hui and near the beaches and would be handled in accordance with ETWB TCW No. 34/2002. WebETWB TCW No. 41/2002 (Appendix A) Page A6 of 7. Appendix A ETWB TCW No. 41/2002 (Appendix A) Page A7 of 7 (viii) If the sum entered against an Adjustment Item is outside the adjustment limits which are ±10% of the grand total of the Bills of Quantities (corrected in accordance with the rules above as necessary) before the addition or deduction ... jenna seavers https://pazzaglinivivai.com

Environmental Protection Department - Reference Material

WebDownload PDF(1.45MB) Download PDF(1.45MB) SHOW MORE WebThree types of disposal options for dredged / excavated sediments were stipulated in the ETWB TC(W) No. 34/2002: Type 1 – Open Sea Disposal or Open Sea Disposal ... Special Treatment / Disposal. In accordance with the ETWBTC (Works) No. 34/3002, the marine sediment to be dredged has been classified as Category L (i.e. require Type 1 - Open ... WebRelated DEVB TCW and Memo 39 Contractor’s joint venture - 50/2002 SETW’s memo ref. (01656-01-3) in ETWB(W) 511/34/01 dated 4.8.2006 SDEV’s memo ref. (03487-01-1) in DEVB(W) 510/83/05 dated 31.12.2024 40 Joint and several liability of partners and unincorporated joint venture participants - ETWB TCW No. 5/2003 laksamana puri condo

香港标准ETWB TCW No34-2002 - 豆丁网

Category:8. WASTE MANAGEMENT 8.1 Introduction - EPD

Tags:Etwb tcw no. 34/2002

Etwb tcw no. 34/2002

ETWB Definition Law Insider

WebMar 25, 2024 · TB/T 3034-2002 (TB/T3034-2002) Description (Translated English) EMC tests and limits for rolling stock apparatus. Sector / Industry. Railway & Train Industry … WebRelated DEVB TCW and Memo 41 Employment of Technician Apprentices and Building & Civil Engineering Graduates by Contractors of Public Works Contracts 12/2003 42 …

Etwb tcw no. 34/2002

Did you know?

WebMay 25, 2012 · 香港标准ETWB TCW No34-2002香港标准. 文档格式:.doc 文档大小: 319.0K 文档页数: 17 页 顶 /踩数: 0 / 0 收藏人数:

WebThe following legislations are set out as procedures for obtaining permission for dredging/excavation: ETWB TCW No. 34/2002, “Management of Dredged/Excavated Sediment” and PNAP No.252 Management of Dredged/Excavated Sediment and the management framework for marine disposal of such sediment. WebIn this respect, and with reference to ETWB TCW No. 34/2002 , the proposed marine ground investigation would be vibrocore sampling on an approximately 250m by 250m to 350m by 350m grid spacing with 100mm subsamples taken at seabed, 0.90m down, 1.9m down and 2.9m down and then every 3 m to the bottom of the dredged layer (up ...

WebETWB TCW No. 33/2002. Management of Construction & Demolition Materials Including Rock - C-2002-33-0-1.pdf: ETWB TCW No. 14/2003. Role of Departmental Safety and … WebEPD Routine Sediment Monitoring Stations. The Environmental Protection Department (EPD) carry out routine monitoring of marine sediments throughout Hong Kong waters at a territory-wide scale. There ar...

WebTechnical Circulars (Works) set out procedures by which policy decisions are to be put into practice by Works Departments. As a general principle, where a Technical Circular …

Web90.42.060. Chapter 43.83B RCW or RCW 43.83.340 not replaced or amended. HTML PDF. 90.42.070. Involuntary impairment of existing water rights not authorized. HTML PDF. … jennas cupcakesWebExamples of ETWB in a sentence. For implementation of additional measures to improve site cleanliness and control mosquito breeding on construction sites, reference should be … jenna sdaoWebMar 29, 2024 · The Environment, Transport and Works Bureau (ETWB) has promulgated a framework for the management of dredged/excavated sediment through the ETWB Technical Circular (Works) No. 34/2002 … laksamana puri condominiumWebThe LCEL and UCEL are presented in Appendix A of ETWB TCW No. 34/2002. Subject to the results of the chemical screening, biological screening may be required to determine the disposal requirement of the sediment. There are three types of disposal options for dredged / excavated sediments stipulated in the ETWB TCW No. 34/2002: laksamana pertama yulianus zebuaWeb39 Contractor’s joint venture - 50/2002 SETW’s memo ref. (01656-01-3) in ETWB(W) 511/34/01 dated 4.8.2006 40 Joint and several liability of partners and unincorporated joint venture participants - ETWB TCW No. 5/2003 laksamana selat sdn bhdWeb• WBTC No. 7/2002: Tree Planting in Public Works • ETWB TCW No. 13/2003: Guidelines and Procedures for Environmental Impact Assessment of Government Projects and Proposals • ETWB TCW No. 34/2003: Community Involvement in Greening Works • ETWB TCW No. 29/2004: Registration of Old and Valuable Trees and Guidelines for their … jennas davisWebThe replacement of natural fine aggregate with recycled CRT glass had no significant effect on the elastic modulus but considerably improved the drying shrinkage of the concrete. In conclusion, the overall properties of heavyweight barite concrete made with the treated and untreated recycled CRT funnel glass are comparable, except for lead ... jenna season 6 survivor